You got three bids. One is dramatically lower than the other two, and you're already leaning toward it. Of course you are. That's why it was written that way.
Here's what nobody tells homeowners: bids that are far apart are almost never bidding the same job. Materials, labor, and overhead cost what they cost. When one number lands way under the others, it isn't because somebody found magic. It's because the scopes aren't the same — and you can't see it, because the cheap bid is always the least specific one.
What a professional estimate actually contains
The test: could you hand this document to a stranger, walk away, and have them build the right thing? If not, it isn't an estimate. It's a number. A real one contains all of this:
- 1A specific scope of work. "Remodel master bath" is not a scope. "Demo tub surround and flooring, haul off, new supply to shower valve, waterproof pan and walls, set 12x24 wall tile, install vanity, top, faucet, mirror, paint walls and trim" is a scope.
- 2Itemized materials with brand, model, and grade. Products you can look up mean the contractor actually priced them.
- 3Allowance lines for selections you haven't made yet — with a stated amount and, critically, a clear explanation of what happens when you go over, including whether labor changes with the selection.
- 4Labor, identified by trade and phase.
- 5Sequence and rough schedule — which trade goes when, and the target completion.
- 6Permits — who pulls them, and whether the fee is in the number or billed at cost.
- 7Exclusions. An explicit list of what is NOT in this price. Good contractors write these down because they hate the argument later as much as you do.
- 8Change-order process, including how added work gets priced.
- 9Payment milestones tied to progress.
- 10Cleanup and debris haul-off, stated plainly, including whether a dumpster is included.
- 11Warranty on workmanship, in writing, with a term.
The anatomy of a lowball
A cheap bid gets cheap in exactly three ways. Once you know them, you can spot them in ninety seconds.
1. The scope is smaller than you think
The most common one, and it's rarely a lie — it's an omission. The bid quietly leaves out demo, haul-off, disposal, permit fees, patching, priming, painting, trim, hardware, or the finish work that makes it look done. All of that is real work somebody has to do. It just isn't in the number you're comparing.
Then on week two you learn the paint is separate. And the debris. And the drywall repair where the old cabinets were. Every one of those becomes a change order at change-order pricing, which is worse than what it would have cost in the original bid.
2. The materials are bottom grade and the allowances are fantasy
Price the cheapest version of everything, then set allowances so low no real person will accept them. You walk into the showroom, discover nothing at that allowance is anything you'd put in your house, and upgrade your way straight to what the honest bids quoted in the first place — plus change-order overhead.
Defuse it by making the allowances real before you sign. Go pick your tile, your fixtures, and your countertop first. A selection you've made can be priced. A placeholder is where budgets go to die.
3. They're skipping something you can't see
The dangerous one. The bid is cheap because something is being left out behind a finished surface where you'll never look:
- No permit, so no inspection, so nobody ever verified the work.
- No waterproofing behind the tile. You won't know for two years. Then you'll know all at once, and it'll cost more than the whole bathroom did.
- No licensed sub for the electrical or the gas. The guy who framed it is also wiring it.
- No insurance, which is a real cost every legitimate contractor carries and prices in.
- No backer board, no flashing, no proper fastening. The invisible half of the job.
This is why the cheapest bid so often becomes the most expensive job. You don't pay the difference in month one. You pay it in year three, when you're paying to demo work you already paid for.
How to compare bids apples to apples
There's one way, and it's easy: give every bidder the same written scope. Write down what you want done, what you want included, and what you want stated explicitly. Hand the identical document to each contractor and ask them to price it.
Now the numbers mean something, and you can ask a real question: "Everyone else included the permit and the haul-off. Where are those in your number?" You'll learn a great deal from the answer. If a bid is still low after that, ask directly why. Some contractors genuinely are more efficient, or they're slow this month, or they've done forty of these in Peachtree City and Senoia and know exactly how long it takes. Those are legitimate reasons, and they can say so in one sentence.
Estimate, bid, and fixed-price contract are not the same word
- Estimate. A professional's best projection of cost. An educated forecast, not a promise. It can move.
- Bid. A firm offer to do a defined scope for a stated price. Firmer, but not binding until both parties sign.
- Fixed-price contract. A signed agreement: this scope, this price. Any change to the price requires a change order you both sign. This is where you want to end up on a defined project.
Fixed price vs. time and materials
Both are honest structures built for different situations. Using the wrong one is how people get upset.
Fixed price is right when the job is defined. A remodel with selections made and scope drawn is a fixed-price job. The contractor carries the risk of their own estimating, which is exactly as it should be — they're the professional.
Time and materials is right when the job is genuinely unknown. Water is staining a ceiling and nobody can tell you where it's coming from until the drywall comes open. A contractor who quotes a hard number on that is either padding heavily to cover the worst case, and you'll overpay, or lowballing it and planning to change-order you later. T&M with a not-to-exceed cap, an hourly rate stated, and materials at cost plus a stated markup is the honest way to price a diagnosis. Once we know what's wrong, we quote the repair fixed.
Bring us your other bids
Seriously — bring them. We'll go through what's in them and what isn't, line by line, and tell you honestly if somebody else's number is a good deal. Sometimes it is. Call Wright Way Services at (770) 301-4638 and we'll write you an estimate you can actually read.